In this project, Omran Boton Alton Co. was responsible for excavating, foundation-building, and constructing the concrete structure of the Ramsar School of Nursing and Midwifery with about 5000 m2 of area and 3 floors.
Project specifications:
Excavating, foundation-building, and constructing the concrete structure
Employer: Babol University of Medical Sciences

[TS_Advanced_Tables id=”43″]
[TS_Advanced_Tables id=”44″]
Image Gallery



